A LONG OVERHAUL

We’ve just spent the past two weeks working around the clock through two major tropical disturbances to prepare this old 1989 camper for the trip out west. There’s still so much work to be done!

The camper will have new floors, new paint, new electrical, new plumbing, new tires, even a new exterior aluminum siding. When we realized the only way to repair the floor was to rebuild it… that’s what we did!

Here are a couple sneak peaks of what’s happening with the camper overhaul. Charlie was up until Midnight last night working on the camper and will likely pull another late night tonight!

We’ll have some better photos soon… the big reveal! Where ever that might be.

Posted in Uncategorized.